SNEAKER FACTORY PROJECTS
POLOKWANE
October 2019
R186 000.00
Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings,Tiling, Bulkheads/Drywalls,Painting
Shopfitting and finishes
Specialized discipline changes to suit new shop
configuration
Electrical/Mechanical and Sprinklers
MALL OF THE SOUTH
November 2019
R92 000.00
Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings,Tiling
Bulkheads/Drywalls,Painting
Shopfitting and Finishes
Specialized discipline changes to suit shop configuration
electrical, mechanical, sprinklers
SAM NTHULI MALL
November 2019
Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings,Tiling,Bulkheads/ Drywalls
Painting
Shopfitting and Finishes
Specialized discipline changes to suit shop configuration
electrical, mechanical, sprinklers
MAMS MALL
November 2019
Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings,Tiling
Bulkheads/Drywalls,Painting
Shopfitting and Finishes
Specialized discipline changes to suit shop configuration
electrical, mechanical, sprinklers
OMV PROJECTS
COOKE MINE
June 2019
R2 200 000.00
Demolishing of existing filter plant including all sheeting,
side cladding, steelwork , total of 320 tons.
Removing, labeling and storing of specialized belts
& filtering equipment
SAINT GOBAINE
August 2019
R1 800 000.00
Demolishing of existing filter plant, effluent plant,
pilot plant, modification and removal of conveyor structures.
Rerooting of main power supplies
Total of 200 tons
GLENCORE
August 2019
R1 800 000.00
Removal of electrical components and instrumentation
from redundant plant removal, transporting and
storing of dryer kiln
Total of 100 tons
WACO PROJECTS
SOLAR PANELS
Jun 2019 - July 2019
R245 000.00
Strengthening existing roof trusses during normal
tenant operations to accommodate for additional
solar panels
CAT LADDER
Jun 2019 - July 2019
Strengthening existing roof trusses during normal
tenant operations to accommodate for additional
solar panels
MOOIRIVIER MALL PROJECTS
DISCHEM PH1 AND 2
April 2019-Aug 2019
R4 563 727.55
Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings, Tiling, Bulkheads/Drywalls
QUEENSPARK
April 2019-Aug 2019
Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings, Tiling, Bulkheads/Drywalls, Painting
Shopfitting and Finishes
Mechanical and Sprinklers installations
MILADYS
April 2019-Aug 2019
Strip out existing tenant installation
Re-construct to new tenant specifications
Ceilings, Tiling, Bulkheads/Drywalls
Painting, Shopfitting and Finishes
Mechanical and Sprinklers installations
WOOLWORTHS
April 2019-Aug 2019
R3 400 000.00
Strip out existing tenant installation
Re-construct to white box specifications
Glazing, Painting, Tiling, Bulkheads/Drywalls
Wet works
Shopfitting and finishes
(all work completed during trading hours)
NAMPO CRI PUMPS
Mrch 2019-Apr 2019
R596 000.00
Conversion of an open shed into a display stall
Extension of roofs
Sheeting and Timber
Walls,Flooring,Ceilings,Electrical Work,Plumbing Work,Display feature
NEWTOWN PROJECTS
JHC
Aug - Sept 2019
R17 000 000.00
Strip out existing tenant installation
Re-construct to new tenant specifications
Glazing, Painting, Bulkheads/Drywalls/Ceilings, Wet Works
Tiling, Plumbing Work, Electrical Work, Mechanical and Sprinklers installations
STUDIO
Apr - May 2019
Strip out existing tenant installation
Re-construct to new tenant specifications
Brickwork, Glazing, Painting, Bulkheads/Drywalls
Wet works, Tiling, Specialized handrailing and staircase, Plumbing work, Electrical work, Mechanical and Sprinklers installations
MAJESTIC OFFICE
Dec 2018 -Feb 2019
1700m2 Shopfitting
Bulkheads/Drywalls
Ceiling, Tiling, Glazing
Access Control
Plumbing work
Electrical work
Mechanical and Sprinklers Installations
SHOP 330 OLD HI-FI CORPORATION GASS OFFICE
Dec 2018 -Mar 2019
Strip out existing
Tenant installation
Re-construct to new tenant specifications
Brickwork
Glazing, Painting
Bulkheads/Drywalls
Wet works, Tiling
Mechanical and Sprinklers installations
MCDONALDS
May 2018 - Sep 2018
Strip out existing
Tenant Specifications
Re-construct to white box specifications
Structural and Sundry Steelwork
Glazing, Painting, Bulkheads/Drywalls, Wet works, External Works, Tiling
OLD MUTAL
Oct 2018 -Nov 2018
Strip out existing tenant installation
Re-construct to white box specifications
Glazing, Painting
Bulkheads/Drywalls
Tiling
ESCALATORS
Oct 2018 -Nov 2018
Complete retro fit of escalator in existing shopping centre
Removal of concrete slabs
Tenant relocation
Structural and sundry steelwork
Glazing, Painting, Tiling
GYPSUM CALCINNING PLANT
POTCHEFSTROOM
April 2018 -Nov 2018
R10 000 000.00
Structural and Sundry Steelwork
Wet works
Concrete bases and plinths
Roof Sheeting
Painting
Co-ordination and design
CLUB 3 - ADVOCATES BUILDING
CLUB 3 - ADVOCATES BUILDING
May 2018 to July 2018
R550 000.00
Structural and Sundry Steelwork
Pergola Structure
Composite Decking
tiling
Stainless Steel Handrails
Bar Construction
NEWTOWN
NEWTOWN - MCDONALDS LED SCREEN CLUB 5 - CARPORTS
June 2018
December 2017
R75 642.00
R697 594.00
Structural and Sundry Steelwork
Painting
Structural and Sundry Steelwork
Roof Sheeting
Solar Panel Steel Work
BUILDERS WAREHOUSE
BUILDERS WAREHOUSE GLENEAGLES
Oct 2017 - Jan 2018
R938 918.00
Structural and Sundry Steelwork
Sliding Stacking Gates
Assistance with design of gates
GENOCIDE AND HOLOCAUST CENTRE
GENOCIDE AND HOLOCAUST CENTRE
Oct 2017 -Nov 2017
R192 000.00
Structural and Sundry Steelwork
Decorative and Architectural Steelwork
HILLSIDE OFFICES
HILLSIDE OFFICES - NEW SOFT ROOF
May 2018
R400 000.00
Structural and Sundry Steelwork
Roof Sheeting
Painting
MALL OF AFRICA
MALL OF AFRICA - LGC TRIBECA ROOFS
August 2017
R612 648.00
Structural and Sundry Steelwork
Feature Steel Roof Structure
Specialised Roof Covering
Waterproofing
Painting
MAPONYA DEVELOPMENT
EXTERNAL WORKS
TIGER WHEEL AND TYRE
BP FILLING STATION
Aug 2017 - Dec 2017
R7 394 566.00
R4 987 161.00
R6 213 470.00
Earthworks
Landscaping
Road Works
Wet works
Shopfitting and Finishes
Structural and Sundry
Steelwork
Painting
Tiling
External works
Structural and Sundry
Steelwork
Painting
Tiling
DUNES MALL
DUNES MALL - CHAMELEON
November 2017
R183 429.00
Sundry Steelwork
Playground feature
Exportation Logistics
MOOIRIVIER MALL
MOOIRIVIER MALL - MILADY'S / MR PRICE
Jun 2017 - Oct 2017
R4 449 465.00
Strip out existing tenant installation
Re-construct to new tenants specifications
Glazing, Painting, Bulkheads/Drywalls, Tiling, Shopfitting and Finishes
High level fire rated demising walls
(All work completed during trading hours
CITY MALL
CITY MALL - WOOLWORTHS
Jun 2017 - Jul 2017
R388 359.00
Strip out existing tenant installation
Re-construct to tenants specifications
Glazing, Painting, Bulkheads/Drywalls
Tiling
shopfitting and Finishes
(All work completed during trading hours
75 GREYSTON AVE
75 GREYSTON AVE
May 2017 - Jul 2017
R919 436.00
Removal of existing Structure
Installation of new steel skylight
Glazing
Bulkheads
Paintwork
HILLSIDE OFFICES
HILLSIDE OFFICES
Apr 2016 - Oct 2016
R541 677.00
Structural and Sundry Steelwork
Louvre Support
Painting
TIGER WHEEL AND TYRE KLERKSDORP
TIGER WHEEL AND TYRE KLERKSDORP
Sep 2016 - Dec 2016
R6 945 960.00
Wet Works
Shopfitting and Finishes
Structural and Sundry Steelwork
External Works / Road Works
Landscaping
Painting
Tiling
NEWTOWN JUNCTION - NEDBANK SUNSCREENS
NEWTOWN JUNCTION - NEDBANK SUNSCREENS
Sep 2016 - Oct 2016
R1 188 444.00
Installation of Structural Steel
Louvre Supports
Working on heights without lifting equipment against
Nedbank Facade / Limited access
Painting
BELA-BELA WILDS WINKEL
BELA-BELA WILDS WINKEL
Feb 2016 - Jun 2016
R9 065 000.00
Wet Works
Shopfitting and Finishes
Structural and Sundry Steelwork
AUTO PEDIGREE SPARTAN
AUTO PEDIGREE SPARTAN
Feb 2016 - May 2016
R1 500 000.00
All Civil & Wet Works
Structural Steel Work
RENAULT SPARTAN
RENAULT SPARTAN
June 2015 - Oct 15
R 3 813 033.00
All Civil & Wet Works
Structural Steel Work
BURGER KING POTCHEFSTROOM
BURGER KING POTCHEFSTROOM
Aug 2015 - Nov 2015
R 7 500 000.00
All Consulting and Contracting Services
Wet Works
Shopfitting & Finishes
Structural Steelwork
VALUE CENTRE FLAMWOOD WALK
VALUE CENTRE FLAMWOOD WALK
Apr 2015 - Dec 2015
R 40 400 935.00
Co-ordination and Project Management
Wet Works
Shopfitting & Finishes
Ceilings and Partitions
Structural & Sundry Steel Work
FLAMWOOD WALK SHOPPING CENTRE
FLAMWOOD WALK SHOPPING CENTRE
Oct 2014 - Oct 2015
R 147 988 000.00
Co-ordination and Project Management
Wet Works
Shopfitting & Finishes
Ceilings and Partitions
Structural & Sundry Steel Work
TOWER MALL SHOPPING CENTRE
TOWER MALL SHOPPING CENTRE
Oct 2013 - Oct 2014
R 115 944 232.00
Co-ordination and Project Management
Wet Works
External Works
Structural & Sundry Steel Work
POTATO SHED NEWTOWN SHOPPING CENTRE
POTATO SHED NEWTOWN SHOPPING CENTRE
Sep 2013 - Nov 2014
R 11 910 400.00
Structural & Sundry
Steel Work
TILE AFRICA FLAMWOOD WALK
TILE AFRICA FLAMWOOD WALK
Nov 2012 - May 2013
R 3 562 958.00
Co-ordination and Project Management
Wet Works
External Works
Structural & Sundry Steel Work
MPONENG MINE CARLETONVILLE
MPONENG MINE CARLETONVILLE
Aug 2012 - Jan 2013
R 1,650,000.00
Construct bases and concrete structure for Shot Blast Machine installation complete
with Steelwork and Cladding.
SAVUKA MINE CARLETONVILLE
SAVUKA MINE CARLETONVILLE
Aug 2012 - Feb 2013
R 1,650,000.00
Do method statement for the rehabilitation of an existing concrete structure and achieve
the tender to carry out the contract.
PALM SPRINGS SHOPPING CENTRE
PALM SPRINGS SHOPPING CENTRE ORANGE FARM VEREENIGING
Jul 2012 - Nov 2012
R 650,000.00
Steelwork installation for the extension of an existing concrete structure and achieve the tender to carry out the contract.
THE AVENUES SPRINGS
THE AVENUES SPRINGS
May 2012 - Jun 2012
R 450,000.00
Take off existing skylights
re-design and install
new skylights complete.
RIVER SQUARE MALL VEREENIGING
RIVER SQUARE MALL VEREENIGING
Feb 2012 - Apr 2012
R 530,000.00
Strip out existing tenant installation
Re-construct and install new tenant installation complete for Shopfitting.
MEDI CLINIC REVAMP
MEDI CLINIC REVAMP VEREENIGING
Feb 2012 - May 2012
R 1,200,000.00
Revamp and improve façade details
Install new features,service roofs, paintwork to existing buildings.
ANGLOGOLD ASHANTI
* Sulphur Paydam
* Valve Store Kopanang
* New Oil Store Moab Mine
* Atds Training Centre
2011- 2012
R 963 556.00
R 282 359.00
R 569 533.00
R 585 492.00
Structural Steelwork
Structural Steelwork
Structural Steelwork
Concrete / Brick/ Form Work
Structural Steelwork
Concrete / Brick/ Form Work
MOAB KHOTSONG MINE
MOAB KHOTSONG MINE
Dec 2011 -June 2012
R 2,800,000.00
Demolish Old Compressor Base- Construct New Base
Construct Cooling Dam for Cooling Towers
DISCHEM FLAMWOOD SHOPPING CENTRE KLERKSDORP
DISCHEM FLAMWOOD SHOPPING CENTRE KLERKSDORP
Nov 2011 - Mar 2012
R 1,500,000.00
Strip out existing Tenant Installation,
Re-construction and install new Tenant Installation
Complete for Shop fitting.
THE HUB AND POST OFFICE INSTALLATION KLERKSDORP CITY MALL
THE HUB AND POST OFFICE INSTALLATION
Nov 2011 - Mar 2012
R 4,850,000.00
Strip out existing Tenant Installation
Re-construction and install new Tenant Installation
Complete for Shop fitting.
G. S. POULTRY KLERKSDORP
G. S. POULTRY KLERKSDORP
Apr 2011 to Jul 2011
R 4,155,823.00
Demolitions, new concrete & wet works
Ceiling & Partitions
Structural & Sundry Steelwork
Cladding
MATLOSANA INDUSTRIES- ORKNEY
MATLOSANA INDUSTRIES- ORKNEY
Apr 2011 to Aug 2011
R 2,748,000.00
2000m² Steelwork warehouse Sheeting & Cladding
Civil & Concrete work
Wet Works
NEWPARK SHOPPING CENTRE KIMBERLEY
NEWPARK SHOPPING CENTRE KIMBERLEY
Feb 2011 - Jul 2011
R 423,822.16
Structural Steelwork
Installation of Conveyors & staircases
Palisade Fencing
BEDWORTH SHOPPING CENTRE VEREENIGING
BEDWORTH SHOPPING CENTRE VEREENIGING
June 2011 - Sep 2011
R 947,328.27
35 Tons of structural roof steelwork
Canopies and sundry steelwork
ONCOLOGY UNIT NATIONAL HOSPITAL BLOEMFONTEIN
ONCOLOGY UNIT NATIONAL HOSPITAL BLOEMFONTEIN
Sep 2010 - Apr 2011
R 12,902,000.00
Bulk Earthworks & Tar road access
Oncology Rooms (262 m²)
Renovation to Exicting(1200m²)
Paving & site work
Dry walling, ceilings, shop fitting
Structural & Sundry steelwork
OFFICE BLOCK KLERKSDORP
OFFICE BLOCK KLERKSDORP
Apr 2010 - Dec 2010
R 3,500,000.00
Design & Planning entire construction
Landscaping & Paving Ceiling & Partitions
Steel Roofs, Gates, Fencing & Sundry Steelwork
CAPITEC BANK CITY MALL KLERKSDORP
CAPITEC BANK CITY MALL KLERKSDORP
Jan 2010 - Feb 2010
R 53 874.98
Re- instate shop 111 Ceiling & Partitions
New floor finishes
SPEEDY 4 X 4 , PHASE 2 KLERKSDORP
SPEEDY 4 X 4 , PHASE 2 KLERKSDORP
May 2010 - Aug 2010
R 3,525,441.00
Structural steelwork, sheeting & cladding
Building & concrete work
CLEARWATER MALL RANDBURG
CLEARWATER MALL RANDBURG
Mar 2010 - Nov 2010
R 978,060.00
Dismantling of existing steelwork and carting away.
Removal of canopies and re-erect in new position.
PEPKOR CITY MALL KLERKSDORP
PEPKOR CITY MALL KLERKSDORP
Jan 2010 - Mar 2010
R962 828.17
Removal of shopfronts, ceiling, brickwork
Installation of new ceilings, shopfronts
Plaster & brick Work
NW MUSICON KLERKSDORP
NW MUSICON KLERKSDORP
Jan 2010 - Feb 2010
R194 300.00
Completion of music rooms
GOLDFIELDS MALL WELKOM
GOLDFIELDS MALL WELKOM
Jan 2010 - Nov 2010
R 12,174,516.63
Structural roof steelwork
Skylights and food courts
Sundry Steelwork
Decorative steelwork
WOODLANDS MALL PRETORIA
WOODLANDS MALL PRETORIA
Jan 2010 - Oct 2010
R 5,476,865.00
Structural roof steelwork
Entrance features
Decorative steelwork
Food court canopies
Sliding gates, palisade, fencing.
SPEEDY 4 X 4 KLERKSDORP
SPEEDY 4 X 4 KLERKSDORP
May 09 - Dec 2009
R 20,950,393.00
Pile Caps Concrete & Brickwork & Paving
Hardened Floors, ceiling & partitions
Structural & Sundry Steelwork
TERMINUS CENTRE, KLERKSDORP
TERMINUS CENTRE, KLERKSDORP
Dec 2009 -Jun 2010
R 3,480,000.00
Ceiling & Partitions
Structural roof steel
Canopies and decorative steel
Palisades, gates, stairs, cages, screens.
MIKES KITCHEN
MIKES KITCHEN
Jan 2010 - Jan 2010
R160 149.20
RENOVATIONS AND MOVE
Plaster work
Ceiling & Partitions
Carpentry & joinery
INCREDIBLE CONNECTION VALUE CENTRE KLERKSDORP
INCREDIBLE CONNECTION VALUE CENTRE KLERKSDORP
Jun 2009 - Jul 2009
R 43,992.60
Renovation on old Hi- Fi Corporation building
Extention on Canopy, laminated beams
Kerb, paving & bollards.
AUTO RAMA KLERKSDORP
AUTO RAMA KLERKSDORP
Sep2009 - Oct 2009
R 14,519.33
Removal of roof structure
CHECKERS HYPER KLERKSDORP
CHECKERS HYPER KLERKSDORP
Apr 09 - May 2009
R 87,780.00
Removal of Pylon
ONCOLOGY UNIT KLERKSDORP HOSPITAL
ONCOLOGY UNIT KLERKSDORP HOSPITAL
Aug 2008 - Apr2009
R 15,693,000.00
Bulk Earthworks
Concrete and wet works
Ceilings, partitions, joinery
Joinery
Steel Roof and sheeting.
Sundry steelwork
Bunker door
HANDY HOUSE KLERKSDORP
HANDY HOUSE KLERKSDORP
June 09 - Sep 2009
R 1 250 000,00
Concrete and wet works
Warehouse steelwork, cladding
Sundry steelwork
KLERKSDORP CITY MALL
KLERKSDORP CITY MALL
Mar 08 - Aug 2009
R 39,700,000.00
R 60,944,000.00
R 3,000,000.00
Parking Deck ( 21000m²)
Centre Addition (9000m²)
Revamp old (15000m²)
Post Contract work
All concrete work, wet works
Bulkheads, ceilings, partitions
Shopfitting
Structural steelwork.
Shopfront supports
Sundry and decorative steelwork
PAMONA WAREHOUSE JOHANNESBURG
PAMONA WAREHOUSE JOHANNESBURG
Jul 2008 - Nov 2008
R 6,264,808.00
Warehouse steelwork in excess of 200 tons in three months
TUSK RIO CASINO KLERKSDORP
TUSK RIO CASINO KLERKSDORP
2004
Aug08 - Dec 2008
R 1,800,000.00
R 2,081,675.00
Phase 1 – Casino and Entertainment Centre -Structural steelwork, sundry steelwork
Phase 2 – Conference Centre and Hotel Facilities
Ceiling and Partitions in Conference Centre
Structural, decorative & Sundry Steelwork
MOOIRIVIER MALL POTCHEFSTROOM
MOOIRIVIER MALL POTCHEFSTROOM
May07 to Aug2008
R 19,622,000.00
Shopping Centre steelwork 1000 tons
Structural roof steelwork
Sundry steelwork
Decorative steelwork
HYPERCAR VEREENIGING
HYPERCAR VEREENIGING
Jun2007 - Feb 2008
R 1,269,290.25
Concrete, formwork , ReinforcementCarpentry & Joinery
Structural, Decorative Steelwork
Roof coverings
BEREA MOTORS PRETORIA
BEREA MOTORS PRETORIA
Aug07 - Dec 2007
R 297,540.00
Structural Steelwork 30 tons
Roof cladding
FLAMWOOD WALK VALUE CENTRE KLERKSDORP
FLAMWOOD WALK VALUE CENTRE KLERKSDORP
Feb2007 - Oct 2007
R 20,012,675.00
6000m² Shopping Centre
Concrete work, wet works, ceiling & partions
Internal work for Sportsmans Warehouse,
Hi-Fi Corporation and Fruit and Veg.
Structural , decorative& sundry Steelwork
MOAB KHOTSONG MINE, 11 SHAFT KLERKSDORP
MOAB KHOTSONG MINE, 11 SHAFT KLERKSDORP
2007
R 74,556.00
Store Bay Extension & Fencing
MICA KLERKSDORP
MICA KLERKSDORP
Jan 2006 - Jul 2006
R 3,200,000.00
Concrete& wet works
Ceiling & partitions
Parking area
Structural- decorative & sundry Steelwork
SPUR BEAR CREEK KLERKSDORP
SPUR BEAR CREEK KLERKSDORP
Jul06 - Dec 2006
R 4,020,000.00
Concrete& wet works
Ceiling & partitions
Parking area
SPUR internal work
Structural,- decorative & sundry Steelwork
ROWLAND SHAFT PHASE 1 ,RUSTENBURG
ROWLAND SHAFT PHASE 1 ,RUSTENBURG
2006
R 1,000,000.00
Conveyor & underground Steelwork
DIAMOND PAVILION KIMBERLEY
DIAMOND PAVILION KIMBERLEY
2006
1 250 000,00
Structural steel for roofs
KIMBERLEY 'GROOT GAT" LOOKOUT POINT
KIMBERLEY 'GROOT GAT" LOOKOUT POINT
Aug06 - Feb 2007
R 1,800,000.00
Cable suspended steel Structure
Stainless steel handrails
MOAB KHOTSONG MINE, ORKNEY,11 SHAFT
MOAB KHOTSONG MINE, ORKNEY,11 SHAFT
2006
R 137,827.61
Dismantle and re-erect Steel Core
Shed Concrete Slab
WESTERN PLATINUM RUSTENBURG
WESTERN PLATINUM RUSTENBURG
2006
R 370,925.50
Conveyor Belt
ANGLOGOLD ASHANTI
CHANGE HOUSES DRIEFONTEINE
Jun 2006 - Jul 2007
R 9,635,337.87
Concrete & Building works
Ceilings and partitions
Tile work, benches
Structural steelwork , roof sheeting.
Sundry and decorative steelwork
JADE SQUARE
SHOWROOM AND OFFICES KLERKSDORP
Apr06 - Mar 2007
R 9,102,900.00
Civil & Concrete works
Wet works, Brick & Plaster
Landscaping and paving Ceiling & partitions
Steel Roofs, gates, sundry steelwork
CTM VRYBURG
CTM VRYBURG
May06 - Apr 2007
R 4,466,078.98
Extension to existing CTM Warehouse
Brickwork, concrete work, finishes.
Structural Steel work, roof covering & Cladding, decorative and sundry steelwork.
CARGO MOTORS POTCHEFSTROOM
CARGO MOTORS POTCHEFSTROOM
May 06 - Oct 2006
R741 000.00
Upgrading of existing dealership
Concrete- and wet works
Ceiling & partitions
Trusses and cladding
MUSICON KLERKSDORP
MUSICON KLERKSDORP
Apr 06 - Dec 2006
R1 500 000.00
New Musicon Building Brickwork ,
plastering & paving
Ceiling & partitions
Structural & Sundry Steelwork
KOPANONG MINE NO 9
KOPANONG MINE NO 9
2005
R 35,502.93
Sliding doors & Gates
PICK AND PAY PHASE 2, KLERKSDORP
PICK AND PAY PHASE 2, KLERKSDORP
Mar 2005 - Feb2006
R9 968 354.21
Piling, concrete work, wet works.
Ceilings and partitions
Finishes
Decorative & Sundry Steelwork
CARGO MOTORS KLERKSDORP
CARGO MOTORS KLERKSDORP
Aug05 - May 2006
R 20,117,648.00
Concrete and wet works
Hardened floors
Ceilings, partitions and finishes
Decorative & Sundry Steelwork
Handrails
SCHOONSPRUIT HIGH SCHOOL KLERKSDORP
SCHOONSPRUIT HIGH SCHOOL KLERKSDORP
Feb 05 - May 2005
R776 723.24
Internal finishes
Replace roof trusses
Replace roof sheeting
DR J.P. VAN DER WALT
DR J.P. VAN DER WALT
May 05 - Oct 2005
R1 145 430.96
Renovation / additions to consulting rooms
Concrete work, wet works
Ceilings and partitions
Finishes
Curved roof steelwork
Cladding
Decorative steelwork
LA PROVANCE HOUSE FOR MR. E. SENEKAL
LA PROVANCE HOUSE FOR MR. E. SENEKAL
Jun 05 - May 2006
R1 098 270
Foundations
Suspended slabs
Brickwork
FLAMWOOD PHASE 5 STANDARD BANK PHASE
FLAMWOOD PHASE 5 STANDARD BANK PHASE
Jan 05 - Aug 2005
R17 427 655.80
Concrete and wet works, basement & 2 floors
Civil Works
Internal Finishes
Structural steelwork and cladding
Decorative and sundry steelwork
MAFIKENG THE CROSSING
SHOPPING CENTRE Assisting Ludick Builders and WGK Steel Bloemfontein
Aug 04 - Aug 2005
R17 427 655.80
Concrete and wet works, basement & 2 floors
Civil Works
Internal Finishes
Structural steelwork and cladding
Decorative and sundry steelwork
MOAB KHOTSONG MINE 11 SHAFT, ORKNEY
MOAB KHOTSONG MINE 11 SHAFT, ORKNEY
2005
R 571,039.82
Booster, Bed frame & re- enforcing Vent Louvre
Light Mass Platform Underground Storage rocks
Penthouse Stairs & Handrails
Penthouse Platform
Farm Gates
MOAB KHOTSONG MINE 11 SHAFT, ORKNEY
MOAB KHOTSONG MINE 11 SHAFT, ORKNEY
2004
R 862,074.23
Concrete Beam76 level wall slinging boom
80 level Main shaft deepening Boxfront
Farmgates Drumplates
Pipe SupportIMS lock-up Cubical
Inspection carrage
WEST WITS MINES CARLETONVILLE
WEST WITS MINES CARLETONVILLE
2004
R 1,421,599.88
RH, Incline Shaft
IMS Handrails
GREAT NOLIGWA MINES SHAFT NO8, RUSTENBURG
GREAT NOLIGWA MINES SHAFT NO8, RUSTENBURG
2004
R 979,485.59
Flask complete with liners
Boxfronts
HOSSY SHAFT RUSTENBURG
HOSSY SHAFT RUSTENBURG
2004
R 1,230,497.92
Winder house Steel Construction
SAFFY SHAFT RUSTENBURG
SAFFY SHAFT RUSTENBURG
2004
R 1,118,796.10
Change houses – Steelwork
MOAB KHOTSONG MINE 11 SHAFT, ORKNEY
MOAB KHOTSONG MINE 11 SHAFT, ORKNEY
2003
R 651,292.45
Loading Station Grating & staircases
Cooling coil Slinging Basket
Concrete kettle & louder
Trolley Baskets
Screens
Concrete Slab
Fencing
KOPANONG MINE SHAFT 9,RUSTENBURG
KOPANONG MINE SHAFT 9,RUSTENBURG
2003
R 868,117.07
Adjustable Pipe Brackets
Fencing
LONMIN PLATINUM K4 RUSTENBURG
LONMIN PLATINUM K4 RUSTENBURG
2002-2006
R 1,677,920.91
Level posts & screens
Tip doors counter weights
Vertical settlers for underflow piping
Level lifting brackets
Settlers valve access platform
Settlers support
Launder Frame With vent seal doors
Sub-station Doors
Explosive Shed
Boxfront Screens
Vent coverplates
Conveyorbelt
Steelwork
LONMIN PLATINUM K4 RUSTENBURG
WEST WITS MINE CARLETONVILLE
2001
R 1,557,032.23
Jumper cars
Drill steel cars
Boxfronts